Facilitator controls
What this page is — a button-by-button guide to the controls the Release Train Engineer (RTE) and PI Planning managers use to run a session: publishing, the access check before the start, the session clock in a session without an agenda, adjustment rounds, breaks, merging, closing and abandoning — and what every other person in the room sees when one of these buttons is pressed.
What it is for — pressing the right control at the right moment, knowing what each confirmation will do before you accept it, and knowing which of these controls you will see at all.
The problem it solves — every one of these buttons changes the event for the whole train. A publish that goes out with features nobody plans leaves their tasks off every board; an abandon instead of a close throws away a plan that was ready to commit; a team member who cannot open their board on the morning of Day 1 costs the team its first breakout. The controls ask before they act, say what will happen, and warn the room when something changes.
Route: /org/tasks/pi-planning?project=…&session=… (the bar under the session name, on every tab) ·
Permission: Run a PI session: start, pause and end the timer, breaks, broadcasts, category
allocation, conflicts, risk synthesis, restart and merge. — used by the session's named facilitator ·
Create, edit and close PI sessions, choose the participating teams, and edit the project's PI
Planning settings. — for publishing, editing and abandoning
1. The controls at a glance
Two people can hold controls in a session, and they hold different ones. The named facilitator is the RTE chosen in the session setup; they run the session even if their only PI permission is Take part in a PI session as a team member: move cards on your own team's board, post, raise risks, propose cross-team dependencies, demo and vote. A manager is anyone holding the manage permission above. Someone who holds the facilitate permission but is not the named facilitator does not get the running controls in a session that names one.
| Control | Named facilitator | Manager | Everyone else |
|---|---|---|---|
| Pencil — edit the session | Yes, until committed | Yes, until committed | No |
| Publish | Yes, in Draft | Yes, in Draft | No |
| Access check chip | Yes, published and not started | Yes, published and not started | No |
| Start planning, End planning, Adjust | Only in a session without an agenda | No | No |
| Break / End break, Pause / Resume, Broadcast | Yes | No | No |
| Merge & commit | Yes, in Review | No | No |
| Close | Yes, once committed | No | No |
| Circled cross — abandon | No | Yes, until committed | No |
| Full screen | Yes, once started | Yes, once started | Yes, once started |
A session runs one of two ways, and the bar changes with it.
| With an agenda | Without an agenda | |
|---|---|---|
| What moves the event on | Starting and closing agenda items on the strip or the Agenda tab | The bar's own buttons |
| How planning starts | Starting the first Planning item (Team breakouts) | Start planning |
| How planning ends | Starting a Review item | End planning |
| How the boards reopen | Starting a Planning or Adjusting item after a review | Adjust and a round length |
| The clock | Item by item on the strip; the session clock from planning on | One countdown for the whole event |
| Features without a team at publish | Not checked — teams get their features after the product vision | Asked about: Publish with unallocated features? |
2. Why you would use it
- No surprise for the room. Every lifecycle control asks first and says in one sentence what will change, so a misclick does not freeze eight boards.
- Problems found the day before, not at 09:00. The access check names each person who cannot open the session or plan on their board, and why.
- Breaks that the remote half of the train sees. The stopwatch floats on every tab, in every location, until the break ends.
- A clean end. Close keeps a committed plan readable for scoring business value later; abandon retires a session that will not be committed without touching a single task.
3. Where it fits in the event
The controls follow the session's status from left to right:
Draft → Publish → Briefing → start of planning → Planning → end of planning → Review → (adjustment round → Adjusting → end of planning → Review) → Merge & commit → Committed → Close → Closed.
Abandon can leave this line at any point before Committed. Breaks, pauses and broadcasts work inside the statuses and never change them. Only one published session of a project can be open at a time: publishing or starting a second one is refused until the first is committed or closed. Drafts do not count, so you can prepare the next PI's session while this one runs.
4. Step by step
Check access before the start
Once the session is published and before it starts, the agenda strip and the Agenda tab show a chip: Everyone can use their board in green, or N of M can't use their board in amber. Click it to open the check.
| # | Element | What it does |
|---|---|---|
| 1 | Per team | One row for the facilitator and one per team: ready, or the number blocked. Under a blocked team, each person with every reason: a missing permission, not a member of a Restricted project, an account that is inactive, invited but not activated, or deleted |
| 2 | Check again | Runs the check again after you have fixed roles or project members |
Each team member needs Open PI Planning sessions read-only: …, the team permission and the Tasks permission to create tasks (the check shows it as Tasks — create). The facilitator needs the view permission and either the team or the facilitate permission. The check never stops you starting.
Publish
| # | Element | What it does |
|---|---|---|
| 1 | What publishing does | Each team gets its board, everyone in the session receives the plan-overview e-mail, and the teams and the PI are fixed from now on |
| 2 | Publish (Continue) | Publishes. The status becomes Briefing |
| 3 | Not yet (Cancel) | Leaves the session in Draft |
In a session without an agenda the message says the boards are seeded straight away with the tasks of each team's features. If some features in the PI have no team yet, a second question follows.
| # | Element | What it does |
|---|---|---|
| 1 | Publish anyway | Publishes; those features' tasks stay off every team board |
| 2 | Cancel | Go back and give them a team on Features & teams |
Run a session without an agenda
| # | Element | What it does |
|---|---|---|
| 1 | The session clock | One countdown for the whole event, no agenda items. It turns red and reads Time is up only at zero; in Review it stops and reads Review · the planning clock is stopped |
| 2 | Pause | Stops the clock; the end moves by the length of the pause. It becomes Resume |
| 3 | End planning | Asks Move to review? — the boards freeze and the session moves to Review, where teams demo and vote |
Before planning, the bar offers Start planning (Start planning? — the clock starts and the boards open). In Review it offers Adjust:
| # | Element | What it does |
|---|---|---|
| 1 | Length of the round | How long the boards open again, in minutes: 15 to 4,320 (three days). Default 45 |
| 2 | Start the round | Opens the boards for the round. The status becomes Adjusting and the planning round goes up — Planning round 2, then 3, beside the status |
In an agenda session these three buttons are not shown; pressing one from an old screen answers This session runs item by item — use Start and Close on the Agenda tab.
Call and end a break
The Break drawer itself is described on The session workspace. While a break runs:
| # | Element | What it does |
|---|---|---|
| 1 | End break | In the bar, for the facilitator: ends the break now |
| 2 | The stopwatch | Floats on every tab for everyone: the break, the time left, the clock is stopped, and for the facilitator End the break. The arrow shrinks it to the name and time |
| 3 | The agenda strip | Names the break and when the session is back |
Pause and Resume are hidden during a break. When the break ends — on time or early — every screen rings three times and shows Break over — back to planning.
What the room sees
| # | Element | What it does |
|---|---|---|
| 1 | The flash | At the top of every open session page, with a short sound: the item that starts now. It fades after 8 s, or close it with ×. Closing or reopening an item flashes Closed: or Reopened: the same way |
Starting an item also moves every screen that may open the item's tab straight to it. If a screen could not be moved, the flash carries a button to the right tab.
| # | Element | What it does |
|---|---|---|
| 1 | The broadcast card | Arrives on every open session page, with a sound, and stays 10 seconds |
| 2 | Read it | Opens Discussion, where the broadcast is pinned |
Browsers may hold back the sound until the page has been clicked once; ask remote participants to click anywhere in the session at the start of the day.
Full screen for the room
| # | Element | What it does |
|---|---|---|
| 1 | Leave full screen | Or press Esc. While it is on, only the session is on screen — the application's and the browser's own bars are hidden |
Full screen appears once the session has started. Drawers, confirmations and the broadcast card still show on top of it. To put a briefing deck on every screen rather than only the room's display, present it to the session from the agenda — see Running the agenda.
On a phone
| # | Element | What it does |
|---|---|---|
| 1 | The session | The application's own header and menu stay on a phone; there is no rail |
| 2 | Status, planning round and clock | The same as on a computer; the per-team presence dots are left out |
| 3 | The agenda strip | Opens the Agenda |
| 4 | Distributed | Local times and the rooms to join |
| 5 | The tabs | Run across the screen — swipe for more. Team boards is not offered on a phone |
| 6 | Chat | Opens the session chat |
End the session: close or abandon
After Merge & commit on Post-PI Planning the session is Committed and the facilitator's bar offers Close.
| # | Element | What it does |
|---|---|---|
| 1 | Close (Continue) | The live feed stops; everything stays readable and objectives can still be scored after the PI |
A session that will never be committed is abandoned by a manager with the circled cross.
| # | Element | What it does |
|---|---|---|
| 1 | Abandon | Closes the session without committing; the boards are archived and tasks stay as they are. You are taken back to the list of sessions |
5. Control and field reference
| Control | Type | Confirmation | Rules |
|---|---|---|---|
| Publish | Button | Publish the session?; then Publish with unallocated features? if needed | Needs a PI with iterations, at least one team and a named facilitator; no other published session of the project open |
| Access check | Chip → drawer | — | Published, not started; facilitator or manager |
| Start planning | Button | Start planning? | No agenda; Briefing |
| Pause / Resume | Button | None | Planning or Adjusting, not during a break |
| End planning | Button | Move to review? | No agenda; Planning or Adjusting |
| Adjust | Button → dialog | The dialog | No agenda; Review; round of 15 to 4,320 minutes |
| Break / End break | Button → drawer / button | None | Once the session has started, until committed |
| Merge & commit | Button | On Post-PI Planning | Review; committing also needs the Planning manage permission |
| Close | Button | Close the session? | Committed |
| Abandon | Icon button | Abandon this session? | Manager; any status before Committed |
| Full screen | Icon button | None | Once started; not on a phone |
6. Worked example
Maya Fernandes runs PI 2026.4 Planning for the Optima Orbit train.
- On Friday she presses Publish, reads the confirmation (Figure 2) and presses Continue. Her session has the SAFe two-day agenda, so no question about unallocated features comes up: Phoenix, Atlas and Orion take their features once the product vision starts.
- On Sunday evening the chip reads 1 of 16 can't use their board. The check shows Hana Suzuki (Atlas) as Invited but has not activated the account yet. Maya asks her to accept the invitation, presses Check again, and the chip turns green (Figure 1).
- On Monday she puts the session in full screen on the room's display (Figure 9). Arjun Rao, at a desk in Bengaluru, sees each new item flash at the top of his screen (Figure 7).
- On Day 2 she calls a 15-minute tea break. The stopwatch counts down on every screen (Figure 6); she ends it two minutes early and everyone hears the wake-up.
- After the final review she presses Merge & commit and commits on Post-PI Planning. A week later, with the business values recorded, she presses Close (Figure 11).
Had the session been a dry run that would never be committed, Lena Hoffmann — who manages PI sessions — would have abandoned it instead (Figure 12), leaving every task untouched.
7. The admin contract
| Must be in place | Where | Without it |
|---|---|---|
| A named facilitator | Session setup | Publishing is refused: Name the facilitator (RTE) … first |
| A PI with iterations | Session setup and the Roadmap | Pick the PI (a phase) before publishing or The PI phase has no sprints under it yet |
| At least one team | Session setup | Add at least one team to the session |
| The manage permission | Role editor | No Publish (unless named facilitator), no pencil, no abandon |
| The Planning manage permission | Role editor | Merge works but commit is refused |
| Team permissions and project membership | Role editor, Project members | The access check lists the people affected |
8. Downstream effects
- Publish e-mails the plan overview to everyone in the session and creates the team boards.
- Start planning, End planning and Adjust change what everyone may do on the boards at once.
- Close stops live updates for everyone; the pages stay readable and business values can still be scored.
- Abandon archives the team boards and the ART Planning Board; the session moves to the closed list.
- The facilitator alone also hears a sound and sees a red card, Atlas has an issue, when a team raises an issue on Scrum of Scrums, with Open Scrum of Scrums.
9. Don't confuse this with…
| This | Is not | Because |
|---|---|---|
| Close | Abandon | Close follows a commit and keeps the plan; abandon ends a session without one |
| End planning | Closing an agenda item | End planning only exists without an agenda; with one, a Review item does it — see Running the agenda |
| The access check | ART readiness | Readiness is the train's checklist of preparations; the access check tests each person's account and rights |
| The room flash | A broadcast | The flash is automatic and fades; a broadcast is written by the RTE and pinned on Discussion |
10. Troubleshooting
| Symptom | Cause | What to do |
|---|---|---|
| Publishing says another session is still running in this project | A published session of the project is not committed or closed | Commit, close or abandon it first |
| No Start planning or End planning | The session has an agenda | Use Start and Close on the agenda strip |
| Start the round stays greyed out | Fewer than 15 minutes | Enter 15 or more |
| You manage sessions but have no Close | Close belongs to the named facilitator | Ask the RTE, or abandon if it was never committed |
| The access chip is missing | The session is a draft, or it has already started | It shows only between publishing and the start |
| No sound with the flash or broadcast | The browser blocks sound until the page is clicked | Click once anywhere in the session |
| No full-screen button | The session has not started, or you are on a phone | Start the session; use a computer for the room display |
| The clock reads Review · the planning clock is stopped with hours left | In Review the planning clock stops | Expected; Adjust starts a new round with its own clock |