Project PI Planning settings
What this page is — the PI Planning tab of a project's settings: six sub-tabs that hold the defaults for every PI Planning session the project runs, and the list of teams that plan in it.
What it is for — so the Release Train Engineer prepares each planning event from the train's own standards instead of rebuilding the same lists, people and defaults every quarter.
The problem it solves — without project defaults, every new session starts from the generic SAFe lists. A train that has agreed its own readiness checklist, its own Scrum of Scrums questions or its own working agreements has to retype them each time, and two sessions of the same train end up running by different rules.
Route: /org/projects/…?tab=pi_planning (Project → Project sections → PI Planning) ·
Permission to view: Open PI Planning sessions read-only: brief, team boards, program board, risks,
discussion, objectives and review. · Permission to change: Create, edit and close PI sessions,
choose the participating teams, and edit the project's PI Planning settings.
1. What the tab holds
The tab is a row of six sub-tabs. Each one keeps one kind of default, and each is saved on its own.
| Sub-tab | What it keeps | Who uses it during the event | Can one session keep its own list? |
|---|---|---|---|
| Planning sessions | Which Planning page the project leans on, the default session length, the default facilitator, the confidence vote switch, the teams linked to the project | Whoever creates a session | The facilitator and length are pre-filled and can be changed in the session's setup |
| Roles & permissions | The rule book: what each role sees and may change in a session | Every participant | No. It applies to every session of the project at once. See Roles and permissions |
| ART readiness | The checklist the RTE works through before the event | The RTE | Yes, the RTE or a PI Planning manager |
| Scrum of Scrums | The checkpoints every team answers during Team breakouts | Teams and the RTE | Yes, the RTE, while the session is open |
| Management review | The questions management works through at the end of Day 1 | The management team | Yes, the management team |
| Working agreements | How the train behaves during the event; everyone agrees to them when they join | Everyone | Yes, the management team; anyone may suggest an addition |
How a session uses the four lists
The four lists — readiness, Scrum of Scrums, management review and working agreements — work the same way. A session follows the project's list until it changes its own. Concretely:
| Situation | What the session shows |
|---|---|
| The session has never changed the list | The project's current list. If you change the project list later, the session shows the new one, even if it is already running |
| The session changed its list | Its own list. Later changes to the project list, and Reset to defaults on the project, do not touch it |
| The project never saved a list | The built-in list, with the note This is the built-in list (or …SAFe checklist, …ten built-in questions, …seven SAFe working agreements) |
Each list's card says so in its description: Sessions use this list live: a change here reaches every session that has not saved a list of its own. Nothing is copied when a session is created.
2. Why you would use it
- Prepare a PI in minutes, not an afternoon. The facilitator, the linked teams and four lists are already in place when the RTE presses New PI session.
- One train, one set of rules. Two consecutive PIs of the same train ask the same Scrum of Scrums questions and agree the same working agreements, so trends between PIs are comparable.
- Learn once, keep it. When a retrospective concludes "we need a checkpoint about environments", adding it here makes it part of every future event rather than a note someone must remember.
- No surprise teams. Only teams linked here can be picked for a session, so a session cannot quietly include a team the project does not plan with.
3. Where it fits in the event
These settings are read at three moments.
| Moment | What is read |
|---|---|
| Creating a session (Create a session) | Default facilitator, default session length, linked teams (all of them are ticked), and the confidence vote switch for the default agenda |
| Before the event | The ART readiness checklist on the session's ART readiness tab (ART readiness) |
| During the event | Scrum of Scrums checkpoints during Team breakouts, management review questions at the end of Day 1, working agreements when each person joins, the rule book and the confidence vote switch throughout — all read live |
4. Planning sessions
| # | Element | What it does |
|---|---|---|
| 1 | The six PI Planning settings tabs | Planning sessions, Roles & permissions, ART readiness, Scrum of Scrums, Management review, Working agreements. Adding &pi=roles, &pi=readiness, &pi=sos, &pi=mgmt or &pi=agreements to the address opens a sub-tab directly |
| 2 | Which Planning page opens first: Single-team planning or PI Planning (multi-team) | With PI Planning (multi-team), opening the project's Planning page from the menu goes straight on to PI Planning. A link into a particular Planning tab or action still opens Planning. With Single-team planning, Planning opens as usual. See the note below |
| 3 | Default session length (15 minutes to 3 days) | Steps of 15 minutes. Used by sessions run on a single clock rather than a timed agenda. A session with an agenda takes its length from the agenda |
| 4 | Default facilitator — pre-filled on every new session | Any member of the project, or No default facilitator. Changeable per session |
| 5 | Confidence vote on or off | Whether the project's sessions run a confidence vote at all. See the note below |
| 6 | The card's description | Multi-team planning sessions: their defaults and the teams that plan in this project. The defaults come first, the linked teams under Teams that plan in this project |
| 7 | Link or unlink teams; each linked team shows its lead, members and FTE | Pick a team from the list to link it. Each card shows the team's code, lead, member count, FTE, the projects it plans for and its skills. The × on a card unlinks it |
With PI Planning (multi-team), the PI Planning session list shows a Single-team planning button (tooltip: This project's Planning page opens on PI Planning; the single-team Planning page is still here). It opens the single-team Planning page and stays there. That page then shows the banner This project plans with several teams: its Planning page opens on PI Planning. with the link Open PI Planning →.
| # | Element | What it does |
|---|---|---|
| 1 | Single-team planning | Opens the project's single-team Planning page and stays there. Shown only when the project's Planning page opens on PI Planning |
With Confidence vote off, every session of the project loses its Confidence vote tab, and a Confidence vote agenda item that has not started yet is switched off, so the run skips it. An item that has already run keeps its place. The default agendas of new sessions leave the item switched off. Every session reads the switch live: switching it back on brings the tab back, and switches the agenda item on again if it had not started. While it is off, any attempt to vote answers The confidence vote is switched off for this project (Project settings → PI Planning).
Link teams
- Open the project, then PI Planning → Planning sessions.
- In Teams that plan in this project, open the picker (it reads Add a team…) and choose a team. The card appears with the chip Not saved yet.
- Repeat for each team, or press × on a card to unlink a team.
- Press Save PI Planning at the foot of the card.
A team that is linked here but has members who are not on the project shows a warning naming them: … is not on this project — add them under Project → Team, or they cannot be assigned the team's tasks. This matters on projects restricted to their members.
Field reference
| Field | Control | Required | Validation | Where the values come from |
|---|---|---|---|---|
| Planning page opens on | Two-way switch | Yes | One of the two | Fixed list: Single-team planning, PI Planning (multi-team) |
| Default session length | Stepper with − and + | Yes | 15 to 4,320 minutes (3 days), in steps of 15 | Typed or stepped |
| Default facilitator | Searchable list | No | Must be a user of your organisation | The project's members |
| Confidence vote | Switch | — | On by default | — |
| Team picker | Searchable list | No | A team must be active | The organisation's planning teams not yet linked (Planning teams) |
The footer reads Last saved with a date and time, or Using defaults until first save. Without the permission to change, it reads Read-only — changing these needs the PI Planning — "Create, edit and close PI sessions, choose the participating teams, and edit the project's PI Planning settings" permission, followed by the permission's code in brackets. The controls show plain text, and there is no Save button.
The same settings inside Task Configuration
The six sub-tabs are also reachable without opening the project: Task Configuration → Estimation & Sizes shows them under the project's estimation settings (the unit tasks are estimated in and the T-shirt sizes). This is handy when you are already adjusting how a project estimates — capacity in story points on the PI boards and the size rows here belong together.
| # | Element | What it does |
|---|---|---|
| 1 | Task Configuration → Estimation & Sizes | The section that carries the embed. The other Task Configuration sections do not show it |
| 2 | The same six PI Planning tabs as Project settings → PI Planning | Planning sessions, Roles & permissions, ART readiness, Scrum of Scrums, Management review, Working agreements — each saved on its own, exactly as described on this page |
| 3 | Changes here and there are the same settings — for the project picked at the top left | Save here and the project's PI Planning tab shows the change, and the other way round. Switching the project at the top left switches the settings too |
The embed follows the same permissions: it appears only for roles with the PI Planning view permission, and it is read-only without Create, edit and close PI sessions, choose the participating teams, and edit the project's PI Planning settings. It is not a second copy — there is one set of defaults per project.
5. ART readiness checklist
| # | Element | What it does |
|---|---|---|
| 1 | The built-in SAFe checklist until the project changes it | Shown while the project has no list of its own. The built-in list has sixteen items: ten needed, six desirable |
| 2 | The item's title | Up to 120 characters. An item with an empty title is dropped when you save |
| 3 | The question the RTE answers | Up to 1,000 characters |
| 4 | Needed (must be ready before the event) or Desirable (can grow over the first PIs) | Needed items are counted on the session's readiness tab as the ones that must be done |
| 5 | Reorder | Move the item up or down |
| 6 | Remove | Takes the item out of the list (saved when you press Save checklist) |
The footer counts the items and how many are needed, up to 40. Save checklist stays grey until the list differs from what is saved. Reset to defaults asks for confirmation — The project goes back to the sixteen SAFe ART readiness items. Sessions that changed their own checklist keep it.
6. Scrum of Scrums, management review and working agreements
These three sub-tabs are the same editor holding three different lists.
| # | Element | What it does |
|---|---|---|
| 1 | Whether the project still uses the built-in list or its own | The note disappears once the project saves its own list |
| 2 | A checkpoint — click to edit its text | Type over the text. Up to 300 characters. An emptied line is dropped on save. A new line's placeholder reads A question every team answers… |
| 3 | Move it up or down | Changes the order teams see |
| 4 | Remove it | Tooltip Remove the checkpoint. Removes the line |
| 5 | Add one (up to 30) | Add a checkpoint adds an empty line at the end |
| 6 | Go back to the built-in list | Asks for confirmation; available only when the project has its own list |
| 7 | Save — sessions use this list live | Save checkpoints. Grey until something changed |
During Team breakouts each team answers every checkpoint with not started, in progress, done or an issue; the RTE follows all teams on the session's Scrum of Scrums tab. See Scrum of Scrums.
| # | Element | What it does |
|---|---|---|
| 1 | Whether the project still uses the built-in list or its own | Ten built-in questions until the project saves its own |
| 2 | A question — click to edit its text | Up to 300 characters. A new line's placeholder reads A question management answers… |
| 3 | Move it up or down | Changes the order management walks through them |
| 4 | Remove it | Tooltip Remove the question |
| 5 | Add one (up to 30) | Add a question |
| 6 | Go back to the built-in list | The project goes back to the ten built-in questions. Sessions that changed their own list keep it. |
| 7 | Save — sessions use this list live | Save questions |
The questions frame the management team's discussion at the end of Day 1, where it records decisions and actions. See Management review.
| # | Element | What it does |
|---|---|---|
| 1 | Whether the project still uses the built-in list or its own | Seven SAFe agreements until the project saves its own |
| 2 | An agreement — click to edit its text | Up to 300 characters. A new line's placeholder reads How we work together… |
| 3 | Move it up or down | Reorders |
| 4 | Remove it | Tooltip Remove the agreement |
| 5 | Add one (up to 30) | Add an agreement |
| 6 | Go back to the built-in list | The project goes back to the seven SAFe working agreements. |
| 7 | Save — sessions use this list live | Save agreements |
Each participant reads and agrees to the working agreements when they join a session; anyone may suggest an addition, which the RTE accepts or declines. See Distributed events and working agreements.
List field reference
| List | Control per line | Limit per line | Lines | Empty lines | Saving with no lines |
|---|---|---|---|---|---|
| ART readiness | Title, question, Needed/Desirable | 120 / 1,000 characters | Up to 40 | Dropped | Not possible: Save stays grey |
| Scrum of Scrums | One text field | 300 characters | Up to 30 | Dropped | Not possible |
| Management review | One text field | 300 characters | Up to 30 | Dropped | Not possible |
| Working agreements | One text field | 300 characters | Up to 30 | Dropped | Not possible |
Repeated spaces inside a line are reduced to one when it is saved. A list that goes over its limit is refused with a message naming the list, such as the Scrum of Scrums list has at most 30 checkpoints, the Management review list has at most 30 questions or the working agreements list has at most 30 agreements; a line that is too long reads, for example, an agreement is at most 300 characters.
7. How a session changes its own list
| List | Where in the session | Who may change it | When |
|---|---|---|---|
| ART readiness | ART readiness tab | The RTE, or someone with the manage permission | While the session is open |
| Scrum of Scrums | Scrum of Scrums tab | The RTE | While the session is open |
| Management review | Management review tab | The management team: the RTE, Product Manager, System Architect, Business Owners and PI Planning managers | While the session is open |
| Working agreements | The working agreements panel | The management team | Until the session is closed |
Once a session saves its own list, it stops following the project's list for good.
When a session removes a checkpoint or readiness item, the teams' answers to that line are removed with it. A line whose text is only edited keeps its answers.
8. Worked example
Maya Fernandes is the RTE of the train that plans Optima Orbit.
- She opens Projects → Optima Orbit → PI Planning → Planning sessions and sets Default facilitator to herself and Default session length to 480 minutes (8 h).
- In Teams that plan in this project she links Phoenix, Atlas and Orion. Each card shows 5 members and 4.5 FTE: the product owner at 50 % and four people at 100 %. The picker now reads Every active team is linked.
- She presses Save PI Planning. The footer shows Last saved with the time.
- On Scrum of Scrums she keeps the seven built-in checkpoints but, after last PI's retrospective, adds Have you checked your test environment bookings? and presses Save checkpoints. The note This is the built-in list disappears.
- On Working agreements she leaves the seven SAFe agreements as they are.
When she later creates PI 2026.4 Planning, the setup is pre-filled with her as facilitator and all three teams ticked. During Team breakouts on Day 1, every team sees eight checkpoints. Atlas marks Have you begun resolving dependencies with other teams? as an issue, which Maya sees on the session's Scrum of Scrums tab.
9. Before this works — what an administrator sets up
| Needed | Without it |
|---|---|
| Open PI Planning sessions read-only: brief, team boards, program board, risks, discussion, objectives and review. | The PI Planning tab does not appear in the project's settings |
| Create, edit and close PI sessions, choose the participating teams, and edit the project's PI Planning settings. | Everything is read-only, and the team picker is not shown |
| Planning teams set up in Organization Settings → Planning Teams | The picker is empty: No teams yet. Teams are set up in Organization Settings → Planning Teams |
| See the organisation's planning teams, their members and projects. | The linked teams still show, but each person's share across all teams (over-100 % warnings) is missing |
| Team members added to the project (projects restricted to their members) | The team card names them as not on the project, and they cannot be given the team's tasks |
| Milestones for the PI and its iterations (Project Planning settings) | Not needed here, but a session cannot be created without them |
10. What these settings affect
| Place | Effect |
|---|---|
| Session setup | Facilitator, length and teams are pre-filled; only linked teams can be picked |
| A session's ART readiness, Scrum of Scrums, Management review and working agreements | Show the project list until the session saves its own |
| The project's Planning page | Opens on PI Planning when the project plans multi-team; the single-team page stays reachable |
| Every session's Confidence vote tab and agenda item | Shown and run only while Confidence vote is on |
| Sessions already published | Keep their teams if you unlink a team here |
11. Don't confuse this with…
| This | Is not | Because |
|---|---|---|
| Project → PI Planning | Project → Planning | Planning holds the single-team planning settings and the planning words (Iteration, Delivery Block, Feature). See Project Planning settings |
| Linking a team here | Creating a team | Teams and their members are created in Organization Settings. See Planning teams |
| Roles & permissions sub-tab | The organisation's roles | The rule book narrows what each session role does; organisation roles decide who reaches PI Planning at all. See Roles and permissions |
| A project list | A session list | A session that changed its list keeps it; the project list only feeds sessions that have not |
12. Troubleshooting
| Symptom | Cause |
|---|---|
| The PI Planning section is missing from the project's sections | Your role lacks the PI Planning view permission |
| Everything is plain text and there is no Save | Your role can view but not change the settings |
| The team picker reads Every active team is linked | Every active planning team is already linked. Create more teams in Organization Settings |
| A team you expect is not in the picker | It is deactivated, or already linked |
| Save checkpoints (or questions, agreements, checklist) stays grey | Nothing changed, or every line is empty |
| Reset to defaults is grey | The project is already on the built-in list |
| A running session still shows the old list after you saved a new one | That session saved a list of its own earlier; edit it on the session's tab |
| A session has no Confidence vote tab | Confidence vote is switched off on Planning sessions |
| The confidence vote is switched off for this project (Project settings → PI Planning). | Someone tried to vote while the switch is off. Switch it on to bring the vote back |
| Opening Planning from the menu lands on PI Planning | Planning page opens on is set to PI Planning (multi-team). Use Single-team planning on the PI Planning page to reach single-team Planning |
| the Scrum of Scrums list has at most 30 checkpoints (or questions, agreements) | The list has more than 30 lines. Remove some before saving |
| The facilitator must be a user of this organisation | The person chosen is no longer an active user |
| A team card warns that people are not on this project | Add them under Project → Team |
| The PI Planning tabs are missing under Task Configuration → Estimation & Sizes | Your role lacks the PI Planning view permission |
| A change made under Task Configuration "did not stick" on another project | The embed edits the project picked at the top left of Task Configuration; pick the other project there |
13. Related
| The rule book in detail | Roles and permissions |
| Creating a session from these defaults | Create a session |
| The teams themselves | Planning teams |