Scrum of Scrums
What this page is — the Scrum of Scrums checkpoints during Team breakouts: how each team answers a short list of questions from the side panel of its own board, and how the Release Train Engineer (RTE) follows every team's answers side by side on the Scrum of Scrums tab and deals with the issues teams raise.
What it is for — giving the RTE a live picture of the breakouts — who has sized its capacity, who is resolving dependencies, who is stuck — without walking from table to table or waiting for the hourly sync.
The problem it solves — in a classic Scrum of Scrums the scrum masters gather around a flip chart once an hour. A team that hits a wall at 13:20 waits forty minutes to say so, and by then it has planned around a wrong assumption. Here a team marks Issue with a note the moment it is stuck, the RTE hears a chime wherever they are in the session, and the issue stays red until someone deals with it.
Route: Orbit Ops → PI Planning → open a session → Team boards → Scrum of Scrums (/org/tasks/pi-planning?project=…&session=…&tab=sos) ·
Who sees the tab: the RTE by default; other roles only when Roles & permissions gives it to them ·
Permission to answer for a team: Take part in a PI session as a team member: move cards on your own team's board, post, raise risks, propose cross-team dependencies, demo and vote., as a member of that team.
1. Checkpoints, answers and issues
A checkpoint is a yes-or-not-yet question every team answers during its breakout, such as Have you begun resolving dependencies with other teams? Each team gives each checkpoint one of four answers:
| Answer | Meaning | Looks like | What the RTE does |
|---|---|---|---|
| Not started | The team has not got to it yet | Grey, empty circle | Nothing yet |
| In progress | The team is working on it | Blue, spinner | Watch it |
| Done | Yes — done | Green, tick | Nothing |
| Issue | The team is stuck and needs help | Red, warning sign, with a note | Act, then Mark addressed |
| Issue · addressed | The RTE has dealt with it | Amber | The team sets it to Done once sorted |
The two sides of the feature are deliberately different:
| Team side | RTE side | |
|---|---|---|
| Where | The SoS tab of the side panel on the team's own board | The Scrum of Scrums link under Team boards in the rail |
| Shows | One team's answers | Every team's answers in a grid, and the open issues on top |
| Changes | The team's own answers and its issue notes | The checkpoint list for this session; addressed or re-opened issues; any team's answer |
2. Why you would use it
- Problems surface in minutes, not at the next sync. An issue reaches the RTE as soon as it is raised.
- The RTE sees the whole train at once. One column per team with n of 7 done shows which team is falling behind before it shows on the board.
- Nothing gets lost. An issue stays on Issues to address until the RTE marks it, and comes back if the team changes its answer.
- The sync gets shorter. When the scrum masters meet, they talk only about the red and amber cells.
- The questions fit your train. Change the list for one session, or for every session of the project.
3. Where it fits in the event
| Session status | Scrum of Scrums tab | Team panel's SoS tab | Teams can answer |
|---|---|---|---|
| Draft, Briefing | Not in the rail | Not shown | No |
| Planning (Day 1 Team breakouts) | Shown | Shown | Yes |
| Review (draft plan review, management review, final plan review) | Shown, read-only for teams | Shown, read-only | No |
| Adjusting (Day 2 Team breakouts, plan rework) | Shown | Shown | Yes |
| Committed, Closed | Not in the rail | Not shown | No |
Answers carry over from Day 1 to Day 2. The RTE can still mark issues addressed during a review — the management review also lists how many Scrum of Scrums issues are still open under What the day tells us. In the distributed three-day agenda, the breakout items are titled hourly Scrum of Scrums as a reminder to hold the sync every hour.
4. Step by step
Answer as a team
- On your team's board, open the side panel and choose SoS. The panel reads Scrum of Scrums: tell the Release Train Engineer where the team stands on each checkpoint.
- For each checkpoint press one of the four buttons. Hover over a button to see what it means.
- If you choose Issue, type what is wrong in What is the issue? (the RTE reads this) and press Enter or click away to save it.
- Read the line under the note: Waiting for the Release Train Engineer, or Addressed by a name — mark it Done when it is sorted.
- When the problem is solved, set the checkpoint to Done.
Each answer shows who set it. Every member of the team with the team permission can change any of the team's answers, so agree within the team who keeps them current — usually the scrum master.
Follow the train and deal with issues (RTE)
- Open Scrum of Scrums under Team boards in the rail. The tab reads Each team marks where it stands on its board; this page follows them live.
- When a team raises an issue you hear a chime and see a notice titled with the team's name, has an issue, carrying its note and an Open Scrum of Scrums button — on whichever tab you are.
- Read the issue under Issues to address: the team, the checkpoint, the note and who raised it when.
- Deal with it — talk to the teams involved, post on Discussion, or note it for the management review.
- Press Mark addressed, either on the issue or in its cell. The team's panel now reads Addressed by your name.
- To undo, press Re-open in the cell.
| # | Element | What it does |
|---|---|---|
| 1 | Scrum of Scrums | A child of Team boards in the rail. While an issue waits, this link — and only this one — turns red with the number of open issues |
| 2 | Issue count | n issues to address in red, or No open issues in green |
| 3 | Edit checkpoints | Change this session's checkpoint list |
| 4 | Issues to address | Each open issue: the team, the checkpoint, the team's note, who raised it and when |
| 5 | Mark addressed | Clears the issue from this list once you have handled it |
| 6 | A team's column | The team's name and colour, and how many checkpoints it has done |
| 7 | A cell | Not started, In progress, Done or Issue with the note. Hover for who set it and when; click it to set the answer for the team |
Change the checkpoints for this session (RTE)
- Press Edit checkpoints. The list opens for editing in place, above the issues and the grid (Figure 3).
- Change the wording, move lines up or down, remove lines, or press Add a checkpoint.
- Press Save checkpoints. The tab now adds This session has its own list. Cancel drops the changes.
| # | Element | What it does |
|---|---|---|
| 1 | The note | Changes here apply to this session only — the project's default list in PI Planning settings stays as it is |
| 2 | A checkpoint | Click the text to edit it. Rewording keeps the answers the teams already gave |
| 3 | Move up / Move down | Changes the order the teams and the grid show. The first line cannot move up, the last cannot move down |
| 4 | Remove the checkpoint | Takes the line off this session's list, and the teams' answers to that line with it. The answers to the checkpoints you keep stay with the teams |
| 5 | Add a checkpoint | Adds an empty line at the bottom; type the question |
| 6 | Save checkpoints | Saves the list for everyone in the session. Greyed out while every line is empty |
A checkpoint you keep keeps the teams' answers, even if you reword it. A checkpoint you remove takes its answers with it. The project's default list is not changed.
Until the RTE saves a list here, the session reads the project's list (Project settings → PI Planning → Scrum of Scrums) live: a change to the project's list reaches every session that has not saved a list of its own. Once saved, the session keeps its own list and the project's changes no longer reach it.
5. Field reference
| Field | Control | Who | Required | Validation | Where the values come from |
|---|---|---|---|---|---|
| Answer | Four buttons (team panel); four labelled buttons in a pop-up (RTE grid) | Team members for their own team; the RTE for any team | No — a checkpoint nobody touched reads Not started | Only while the session is in Planning or Adjusting | Fixed: Not started, In progress, Done, Issue |
| Issue note | Single-line text | As above, when the answer is Issue | No | Up to 500 characters; saved on Enter or when you leave the field | Typed by the team |
| Mark addressed / Re-open | Button and link | The RTE | — | Only on an Issue; until the session is committed | — |
| Checkpoint | Text line, with move up, move down and remove | The RTE | At least one line to save | Up to 300 characters each; up to 30 checkpoints; empty lines dropped | The project's list, read live, until the session saves its own |
The default checkpoints
A project that has not saved its own list uses the SAFe Scrum of Scrums questions:
- Have you identified the capacity for each iteration in the PI?
- Have you identified most of the stories for the first two iterations and begun estimating?
- Have you begun resolving dependencies with other teams?
- Are you discussing trade-offs and conflicting priorities with business owners?
- Have you identified program risks?
- Will you be ready to start writing PI objectives in the next 15 minutes?
- Is there anything you need to discuss with other Scrum Masters? If so, stay for the meet-after.
6. Worked example — Atlas gets stuck on a dependency
Day 1, Team breakouts, session PI 2026.4 Planning.
- By mid-afternoon Phoenix has marked checkpoints 1, 2, 4 and 5 Done; Tom Becker set them. Its column on the RTE's grid reads 4 of 7 done.
- Phoenix's one-tap checkout waits on Atlas's device fingerprint signals, needed in Iteration 1. Atlas's plan puts fingerprints in Iteration 2, behind Fraud scoring v2.
- Aisha Bello, Atlas's scrum master, sets checkpoint 3 to Issue and types Phoenix needs device fingerprints in Iteration 1 — we can only do Iteration 2 unless Fraud scoring moves up.
- Maya Fernandes is on the ART Planning Board. She hears the chime and sees Atlas has an issue with the note. She presses Open Scrum of Scrums: the rail link is red with 1, and the issue is at the top.
- This is a priority call between two features, not something the teams can settle. Maya keeps it open and takes it to the management review that evening, where management tells Atlas to do fingerprints first.
- Maya presses Mark addressed. Atlas's cell turns amber, Issue · addressed, and Aisha's panel reads Addressed by Maya Fernandes — mark it Done when it is sorted.
- On Day 2, after re-planning, Aisha sets checkpoint 3 to Done.
7. The admin contract
| Must be in place | Where | What happens without it |
|---|---|---|
| The project's default checkpoints | Project settings → PI Planning → Scrum of Scrums — edited with Add a checkpoint (placeholder A question every team answers…) and the bin (Remove the checkpoint) | Sessions use the seven SAFe questions |
| Permission to change the project list | Create, edit and close PI sessions, choose the participating teams, and edit the project's PI Planning settings. | The project list is read-only |
| A named facilitator | Session setup | Nobody can edit the session's list or mark issues addressed |
| Team members with the team permission | Organisation settings → Planning Teams, and the role editor | They see their team's answers but cannot change them |
| The tab given to other roles, if wanted | Roles & permissions | Only the RTE sees the Scrum of Scrums tab |
| A Team breakouts item on the agenda | Session setup | The session never reaches Planning, so teams never answer |
Roles that are given the tab see every team's answers, but only the RTE edits the list and marks issues addressed. Team members always see their own team's answers only.
8. Downstream effects
- Rail. While any issue waits, the Scrum of Scrums link turns red with the count. The other links grouped under Team boards — Draft plan review, Management review, Planning adjustments and Final plan review — carry no issue count; the alarm is on Scrum of Scrums alone.
- Team panel. The SoS icon on the team's panel carries a red dot while the team has an open issue.
- Management review. What the day tells us includes Scrum of Scrums issues, with the number not yet addressed.
- Changing an answer re-opens it. Any change to an addressed issue — a new answer or an edited note — clears addressed. If the team sets Issue again, it returns to Issues to address.
- One chime per issue. The RTE is alerted when a checkpoint becomes an issue, not each time its note is edited.
9. Don't confuse this with…
| This | Is not | Because |
|---|---|---|
| An Issue on a checkpoint | A risk | Risks are ROAMed and outlive the event — see Risks and ROAM |
| An Issue | A dependency | Record the dependency on the team board; the issue only says the team needs help now |
| The Scrum of Scrums tab | The ART Planning Board | The board shows features and links; this tab shows how the breakouts are going |
| Session checkpoints | Project checkpoints | Editing here changes this session only; editing the project's list reaches every session that has not saved its own |
| Mark addressed | Done | The RTE addresses; the team decides when it is done |
10. Troubleshooting
| Symptom | Cause | What to do |
|---|---|---|
| No Scrum of Scrums link in my rail | The session is not in Planning, Review or Adjusting, or your role does not have the tab | Wait for Team breakouts; ask for the tab in Roles & permissions |
| No SoS tab on the team panel | The session is not in Planning, Review or Adjusting | Expected before Team breakouts |
| The answer buttons are greyed out | The session is in Review, or you are not a member of this team with the team permission | Answer during a breakout; the panel says Only this team (and the RTE) marks it, while the teams plan |
| My issue note disappeared | You changed the answer away from Issue | Set Issue again and retype the note |
| An addressed issue is red again | The team changed the answer or the note | Read the new note, then mark it addressed again |
| Edit checkpoints and Mark addressed are missing | You can see the tab through Roles & permissions but are not the RTE | Expected; ask the RTE |
| the Scrum of Scrums list has at most 30 checkpoints | The list holds more than 30 lines; Add a checkpoint disappears at 30 | Remove some |
| a checkpoint is at most 300 characters | One line is too long | Shorten it |
| A change to the project's checkpoints did not reach a session | That session saved its own list (This session has its own list.) | Edit the session's list with Edit checkpoints |