Create a session

What this page is — the PI Planning page's list of sessions and the five-step setup behind New PI session: PI & sprints, Teams & roles, Agenda, Scope and Vision. It also covers editing a draft and publishing it.

What it is for — preparing one planning event: which programme increment it plans, which teams take part, who plays which role, the timed agenda, the features in scope and the briefing material.

The problem it solves — a PI Planning event involves dozens of people, two days and a fixed agenda. If the PI, the teams or the scope are wrong when the event starts, every board is seeded with the wrong work and the room loses its first hour fixing it.

Route: /org/tasks/pi-planning (list) and /org/tasks/pi-planning/setup (setup) · Permission to create: Create, edit and close PI sessions, choose the participating teams, and edit the project's PI Planning settings.


Where to find it — in the sidebar, open Task Management and pick PI Planning; the entry stays lit on every PI Planning page, and the header shows Task Management · PI Planning above the project picker. The list always belongs to the project picked in the header. Other ways in — the header's quick create, the PI live light, the Cockpit tile and the Planning page banner — are described in Ways into PI Planning.

1. Sessions and their status​

A session is one planning event: several teams plan the same programme increment together, each on its own board, against one shared clock, and commit it as one plan. A session moves through these statuses:

StatusMeaningCan the setup be changed?
DraftBeing set upEverything
BriefingPublished: everyone reads the brief; the facilitator starts when the room is readyName, roles, documents, agenda items still to come, capacity measure
PlanningTeams plan on their boardsName, roles, documents, agenda items still to come
ReviewBoards are frozen for reviews and the voteAs above
AdjustingAn adjustment roundAs above
CommittedThe merged plan is written to the tasksNothing
ClosedFinished; everything stays readableNothing

The PI, the teams and the scope are fixed once the session is published.

DraftPublished
Team boardsNot created yetOne per team
Who is toldNobodyEveryone in the session is e-mailed the plan overview
Several at onceAny number of drafts per projectOnly one published, unfinished session per project

2. Why you would use it​

  • The event starts on time. Everything the room needs — boards, agenda, roles, briefing decks — is ready before anyone walks in.
  • Fewer surprises in the room. The setup warns about overlapping PIs, missing iterations and people who are not on the project while there is still time to fix them.
  • The right work on the right boards. Only features you tick reach the teams, ranked by WSJF.
  • Reusable. Start the next PI Planning (in Post-PI Planning) opens a new setup copying the teams, roles, facilitator, measure and agenda of the last event.

3. Where it fits in the event​

BeforeThis pageAfter
Planning teams exist and are linked in Project PI Planning settings; the PI and its iterations exist as milestonesCreate the draft, then publish itART readiness, the Brief, then the agenda runs (Agenda)

4. The session list​

Figure 1 — The session list with one draft session.
#ElementWhat it does
1Show closed sessions tooClosed sessions are hidden by default
2New PI session — opens the five-step setupShown to roles that may create sessions
3A session: its name, PI and datesNo PI yet when none is picked
4Its status — Draft until publishedHover for what the status means
5The teams that plan in itNo teams yet when none
6Facilitator (the RTE) and the agenda's total lengthAdds · planning round 2, · planning round 3 and so on once the session has been through adjustment rounds
7Edit the setup; click the card to open the sessionThe pencil opens the setup. It is not shown on committed or closed sessions

When two unfinished sessions cover overlapping dates, the card shows Dates overlap with the other session's name. With no session yet, the page offers Create the first session →, or First, link the teams that plan in this project → if no team is linked. When the project's Planning page opens on PI Planning, the list also shows a Single-team planning button; see Project PI Planning settings.


5. Step by step​

The five steps are buttons along the top. Next checks the current step; you can go back freely, but you cannot jump forward past a step with a problem. Save (or Create session) checks every step and takes you to the first one that needs attention. Cancel returns to the list without saving.

Step 1 — PI & sprints​

Figure 2 — Step 1: the name, the capacity measure and the PI on the timeline.
#ElementWhat it does
1The five steps — a tick marks a finished stepClick a step to go to it
2Session nameRequired, up to 120 characters
3Capacity measured in: Hours, Days, Story points or Value (money)What teams plan their load against. The project's planning unit is marked Project default. Fixed once planning starts
4Pick the delivery block (the PI) on the timeline — the red line is todayEach bar is one of the project's phases (named with your planning word, here Delivery Block), with its iterations
5The PI's dates and its iterations — add, rename or re-date them hereChanges are saved to the project's milestones straight away. Needs the right to manage the project's milestones
6Save (or Create session on a new one)Saves all five steps at once

If another unfinished session covers the same dates, a note reads Dates overlap: — Only one session of a project can run at a time — publishing or starting this one waits until the other is committed or closed.

Step 2 — Teams & roles​

Figure 3 — Step 2: the teams and the train's roles.
#ElementWhat it does
1The teams that plan in this session (from the project's linked teams)All linked teams are ticked on a new session
2Link more teams to the project (opens Project → PI Planning)Opens in a new browser tab so this setup keeps what you typed; press Refresh afterwards
3Tick a team in or out; expand it to see its membersThe expanded table lists each member's role, share and skills. In a draft, Move to… lends a person to another team for this session only, and Move back undoes it
4Release Train Engineer — the facilitator who runs the sessionPre-filled from the project's default facilitator. Needs at least the team permission
5Product ManagerOptional: Not named
6System ArchitectOptional
7Business Owners — they give team objectives their business valueUp to 20
8System team — one or more teams that integrate for the othersOnly the session's teams can be ticked

The people offered for each role are the project's members. The roles here decide what each person may do in the session; see Roles and permissions.

Step 3 — Agenda​

Figure 4 — Step 3: the SAFe two-day agenda, here with Plan rework (if needed) switched on.
#ElementWhat it does
1The statuses the agenda moves through — Briefing, Planning, Review, Adjusting, Retrospective — with item countsClick a status to switch all its items off, or on again. The total length of the switched-on items is shown at the right
2Add dayUp to five days
3Reset to the SAFe two-day agendaAsks Use the SAFe default agenda?; your changes are lost
4Replace it with the distributed three-day splitShorter days for trains in two time zones; asks for confirmation
5A day, its hours and total lengthThe bin icon removes the day; later days move up
6Switch an item on or off (Plan rework starts off)An item that is off is skipped when the agenda runs and does not count towards the total
7The status the item puts the session in; then its start, end, title and lengthThe status list is below the times. The title takes up to 80 characters, the end must be after the start, and the length chip is worked out from the times. The bin removes the item; Add item at the foot of a day adds one

When the project's Confidence vote switch is off, the default agendas — the SAFe two-day agenda and the distributed split, whether a new session starts with them or you press SAFe default or Distributed 3-day split — leave the Confidence vote item switched off.

With Plan rework (if needed) switched on, as in the figure, the agenda grows to 18 h 15 min and the Adjusting chip counts three items. Most trains leave it off and let the confidence vote switch it on only when a rework is really needed.

When the agenda runs, starting an item of another status takes the lifecycle step first: a Briefing → Planning item starts planning; a Review item after planning moves the session to Review; a Planning or Adjusting item after a review opens an adjustment round.

Step 4 — Scope​

Figure 5 — Step 4: the features in this PI's scope.
#ElementWhat it does
1Tick all or noneChanges every row at once
2The project's features (categories), best WSJF firstInactive features are not listed. Enabler marks enabler features
3Cost of delay, job size and WSJF from the featureRead-only here; set them on the feature
4A ticked feature is in this PI's scopeOn a new session, every feature not done that still has open tasks is ticked
5How many features are in scopeCounted live

Also plan open tasks with no feature brings unassigned work into the session too. The features' tasks reach the teams once teams are given their features on the Features & teams tab, after the Product / solution vision item has started.

Step 5 — Vision​

Figure 6 — Step 5: briefing documents per agenda item.
#ElementWhat it does
1The briefing items of the agenda, with how many documents each holdsOnly Briefing items that are switched on, plus Other material
2Pick an item to attach its deckThe right side shows that item's documents
3Upload a file (PDF, image or video preview in the app; Office files download)Up to 50 MB each
4Or add a link — Google Slides, OneDrive, SharePoint, Figma, YouTubeNeeds a title and an address starting with http:// or https://
5Add the linkAdds it to the item

On a new session, files are uploaded right after the session is created; a window counts them off (Keep this page open). A file that fails can be added again on the Brief tab.

Field reference​

FieldControlRequiredValidationWhere values come from
Session nameTextYes1–120 charactersTyped
Capacity measured inFour cardsYes—Fixed list; the project's planning unit is the default
PI (delivery block)TimelineYesMust be a phase of the project with at least one iterationThe project's milestones
TeamsCheckboxesAt least oneActive and linked to the projectProject → PI Planning
Release Train EngineerSearchable listTo publishA user of your organisationProject members; default from project settings
Product Manager, System ArchitectSearchable listNoUsers of your organisationProject members
Business OwnersChips + listNoUp to 20Project members
System teamCheckboxesNoOne of the session's teamsThe ticked teams
Agenda itemsSwitch, times, title, statusAt least one item onNo overlaps on a day; up to 60 items; days 1–5SAFe default, distributed split, or typed
ScopeCheckboxesNoFeatures of this projectThe project's features
Vision documentsUpload / linkNo50 MB per file; links need http(s)Your files

6. Edit a draft and publish it​

  • Edit: the pencil on the card, or the pencil in the session's header. The named facilitator and roles with the manage permission can edit.
  • Publish: open the session and press Publish. The confirmation explains that each team gets its own board, that everyone in the session — teams, facilitator, Product Manager, System Architect and Business Owners — is e-mailed the plan overview, and that Teams and the PI cannot change after this. The status becomes Briefing.

Publishing is refused when the session has no PI, no facilitator, no teams, a PI with no iterations, or while another session of the project is published and not yet committed or closed.


7. Worked example​

Maya Fernandes prepares PI 2026.4 Planning in Optima Orbit.

  1. New PI session. She names it PI 2026.4 Planning, picks Story points, and clicks PI 2026.4 on the timeline (5 Oct – 13 Nov, Iterations 1–3 of two weeks each).
  2. Teams & roles. Phoenix, Atlas and Orion are already ticked. She is pre-filled as RTE, and names Lena Hoffmann (Product Manager), Kenji Watanabe (System Architect), Sofia Alvarez and David Okafor (Business Owners).
  3. Agenda. She keeps the SAFe two-day default: 17 h 15 min, with Plan rework (if needed) off.
  4. Scope. She unticks Orbit Papers and keeps five features: Observability platform, Mobile Checkout 2.0, UPI AutoPay mandates, Fraud scoring v2 and Offline mode — 21 stories.
  5. Vision. She uploads the Business context — PI 2026.4 PDF to Business context and links the product vision deck to Product / solution vision.
  6. Create session. The list shows the card with Draft, the three teams and Facilitator Maya Fernandes · 17 h 15 min. After the readiness checks she presses Publish; the session moves to Briefing and everyone is e-mailed.

8. Before this works — what an administrator sets up​

NeededWithout it
Create, edit and close PI sessions, choose the participating teams, and edit the project's PI Planning settings.New PI session is missing; the setup shows You cannot set up PI sessions
Teams linked in Project → PI PlanningNo team is linked to this project yet
A phase with iterations in the project's milestonesThis project has no … yet, or The … has no …s on step 1
Features with WSJF valuesThe scope is empty or unranked: This project has no features yet
Permission to see featuresYou cannot see the features; scope can be set later on Features & teams
The facilitator holds at least Take part in a PI session as a team member: move cards on your own team's board, post, raise risks, propose cross-team dependencies, demo and vote.They cannot run the session

9. What publishing sets in motion​

EffectWhere
A board per team, seeded once features are given to teamsTeam boards
The e-mailed plan overview to everyone namedInboxes
On projects shared with the organisation, team members join the projectProject members
The readiness checklist becomes the RTE's working listART readiness

10. Don't confuse this with…​

ThisIs notBecause
A PI sessionA Planning scenarioA scenario is one team's what-if plan; a session brings several teams together
The PI (delivery block)An iterationThe PI is the phase; iterations are the sprints under it
Release Train EngineerThe default facilitatorThe default only pre-fills the field; see Project PI Planning settings
ScopeFeatures & teamsScope chooses features; Features & teams gives them to teams

11. Troubleshooting​

SymptomCause
Give the session a nameThe name is empty
Pick the delivery block this PI coversNo PI picked on the timeline
The delivery block has no iterationsAdd iterations under the PI in step 1
Pick at least one team.Every team is unticked
… and … overlap on day …Two switched-on agenda items overlap
Switch on at least one agenda item.Every item is off
The team checkboxes and scope are greyedThe session is published
A team you linked does not appearPress Refresh on step 2
Publish is refused naming another sessionThat session is still running; commit or close it first
The file is too largeFiles are limited to 50 MB
You can open the setup but saving is refusedOnly the named facilitator or someone with the manage permission may save
The Confidence vote agenda item starts switched offThe project's Confidence vote switch is off; the session has no vote

Project defaultsProject PI Planning settings
Who may do whatRoles and permissions
Running the agendaAgenda
Other ways inWays into PI Planning
Locked, empty and read-only screensAccess, empty and locked states