Team boards
What this page is — a guide to the Team boards tab of a PI Planning session: the board each team plans on during the breakouts, with its capacity, its iterations, its story cards, its cross-team dependencies and the team panel of risks, objectives, dependencies and Scrum of Scrums checkpoints.
What it is for — turning the features a team was given into a plan the team believes in: which stories go into which iteration, who does them, how big they are, what the team waits for from other teams, and what it promises the business.
The problem it solves — without a board per team, a room of three or more teams plans on sticky notes and spreadsheets. Nobody sees that a team has put 11 story points into an iteration that holds 10, a dependency on another team is a hallway conversation that nobody answers, and the plan has to be typed into the tracker by hand afterwards, with mistakes.
Route: Orbit Ops → PI Planning → open a session → Team boards (/org/tasks/pi-planning?project=…&session=…&tab=boards)
· Permission to view: Open PI Planning sessions read-only: brief, team boards, program board, risks, discussion, objectives and review.
· Permission to plan: Take part in a PI session as a team member: move cards on your own team's board, post, raise risks, propose cross-team dependencies, demo and vote.
1. What a team board is
Every team in the session gets its own board when the session is published. The board is a private draft of the team's part of the plan: it holds only the stories of the features the team was given on Features & teams, and only the capacity of the team's own people. Moving a card here changes nothing in the project's tasks until the whole train's plan is merged and committed after the event.
| Team board | ART Planning Board | Planning (the single-planner page) | |
|---|---|---|---|
| Whose work | One team's stories | Every team's features, side by side | The whole project |
| Who changes it | That team, within its roles; the RTE | Teams drag their own feature targets; the RTE | One planner per scenario |
| Granularity | Stories and tasks | Features, milestones, significant dependencies | Tasks |
| Capacity | The team's own members only | Per team and iteration | Everyone in the scenario |
| Reaches the tasks | At merge & commit | At merge & commit | At commit of the scenario |
The board uses the project's planning words. In the demo project Sprint is renamed Iteration and Category is renamed Feature, so the views read Iterations and Feature, and the capacity panel reads Capacity per iteration and 1 iteration to check. In a project that keeps the word Sprint, the same labels read sprint.
2. Why you would use it
- A realistic plan, checked as you go. Each iteration shows its load against the team's target and full capacity the moment a card lands, so over-commitment is visible before the draft plan review, not after.
- Dependencies that get an answer. A story that waits on another team becomes a dependency card on both teams' boards, with a needed-by iteration and a status, until the other team accepts or declines it.
- Objectives next to the work. The team writes its committed and stretch objectives in the panel beside the board, while it can still see what it has planned.
- One source for every later step. The draft plan review, the management review, the ART Planning Board, the confidence vote and the final merge all read what the team built here. Nobody re-types the plan.
3. Where it fits in the event
The boards open for participants when the facilitator starts the Team breakouts agenda item on Day 1. Before that, a participant sees The team boards open when Team breakouts starts; the facilitator and people with the manage permission can look earlier.
| Session status | What a team member can do on the board |
|---|---|
| Briefing | Nothing yet — the board is locked |
| Planning (Team breakout #1 and #2) | Plan, within the rights of their roles |
| Review (draft plan review, management review, final plan review) | Read only; risks, objectives and dependencies stay open |
| Adjusting (an adjustment round) | Plan again |
| Committed or closed | Read only |
Someone in the session who is in no team sees a note above the session's tabs saying what their role lets them do. A Business Owner, for example, reads You take part as a Business Owner, not in a team: you set the business value of the teams' PI objectives (from Team breakout #2), … and vote in the ART confidence vote. Planning the team boards is for their teams. The list follows the project's rule book: setting business value (Business Owners), picking features for any team, writing PI objectives, taking part in the Management review, raising risks, and voting in the ART confidence vote when the project uses it. Someone with no team and no ART role reads You are following this session as an observer: everything is visible, nothing can be changed.
When the board is read-only the line above it says why, for example Read-only — the boards open when planning starts again (adjustment round).
On Day 2 the same board carries the management review's decisions for the team (a banner reads, for example, 1 management adjustment for Phoenix · 1 to answer with Show them), and, if a confidence vote sent the plan back, a Plan rework banner. Those are covered in Planning adjustments and Plan rework.
4. The top of the board
| # | Element | What it does |
|---|---|---|
| 1 | Team switcher | One button per team. Your own team comes first and is marked You; the number is its open stories; a green dot means someone of that team is online. Other teams' boards are shown only if your roles may open them |
| 2 | Team strip | The team's Product owner, Scrum master and Lead, so the room knows who decides for the team |
| 3 | N members | Opens everyone in the team: role, share of time, skills and who is online. These are the people who count toward capacity |
| 4 | Capacity header | The measure the session counts in (here Story points) and the focus factor, for example focus 80% |
| 5 | Warning chip | How many iterations need a look — 1 iteration to check, 2 iterations to check — above the focus target, over capacity, or a task type above its share |
| 6 | Iteration capacity card | Per iteration: the load against the target and the full capacity, with a status chip. Red means over capacity |
| 7 | Set capacity | Opens the capacity editor. Shown only to someone who may change capacity, while the team plans |
| 8 | Rule-book line | What you may do here, from the project's Roles & permissions rule book: You can plan on this board. or Read-only with the reason |
| 9 | Plan by | Which question the columns answer: Iterations, Resource, Size, Feature, Type, Priority, Status, Milestone, Dependencies |
| 10 | Group by | Cuts every column into horizontal lanes by a second dimension |
| 11 | Assignee filter | Everyone, Unassigned, or one person's cards |
| 12 | Card fields | Adds up to three extra lines to every card |
The capacity panel
The capacity panel answers one question per iteration: can this team really do what it has planned?
- Target is the full capacity times the focus factor. Within the target the card reads Within focus (green). Above the target but within the full capacity it reads Above focus (amber). Above the full capacity it reads Over capacity (red). With no capacity set it reads No capacity set.
- The bar shows the load; the small black tick on it is the focus target.
- Loaded is the same load broken down by task type. When the team has set a split by task type, a second bar, Split, shows the planned share, and a type above its share is listed under the card.
Where capacity comes from depends on the session's measure:
| Session measure | Where the capacity comes from |
|---|---|
| Story points, or value | The team types it per iteration in Set capacity, once Team breakouts has started |
| Hours or days | Worked out from the people on the board: their availability, their share of time and the focus factor |
Set capacity
Set capacity opens the capacity editor inside the capacity panel, above the iteration cards. The left half is the capacity per iteration; the right half is the optional split by task type; the focus factor sits under the iterations. The cards below keep showing the current load while you type, so you can see an iteration turn from red to green before you save.
| # | Element | What it does |
|---|---|---|
| 1 | Capacity per iteration | One row per iteration of the PI, under the column Iteration, with its dates, in the session's measure (story points here). The heading and the column use the project's word for a sprint |
| 2 | An iteration's capacity | What the team can do in that iteration. In a story-point or value session the team types it; it starts from the team's people and their share of time |
| 3 | Split by task type | Optional. A percentage per task type, with a running total (0% of 100%). Whatever is left stays free for any type |
| 4 | Focus factor | The share of capacity the team plans to fill. 0.8 means the target is 80 % of the capacity, so 10 SP of capacity gives an 8 SP target |
| 5 | Save capacity | Saves the capacity, the split and the focus factor for this team; the iteration cards recalculate at once. Cancel closes the editor without saving |
Field reference
| Field | Control | Required | Validation | Where the value comes from |
|---|---|---|---|---|
| Capacity per iteration | Number field per iteration, with the unit after it (SP, d, h or the currency) | No — empty means not set | Zero or more | Typed by the team. Shown only for story-point and value sessions |
| Focus factor | Number field, steps of 0.05 | No | Between 0.10 and 1.00; outside that the field turns red and Save capacity is disabled | Starts from the project's Planning settings, else 0.80 |
| Split by task type | One percentage field per task type, with a live bar | No | Each 0–100 %; the total may not exceed 100 % | The project's task types. Whatever is left "stays free for any type" |
Only a member of the team whose role has the Team capacity right in the rule book, or the RTE, sees Set capacity, and only while the session is planning or adjusting.
5. The iterations and the cards
| # | Element | What it does |
|---|---|---|
| 1 | Backlog | The team's stories not yet in an iteration (Not planned into an iteration or delivery block yet), with their count and unplanned size |
| 2 | Iteration header | The iteration's dates, its load against the target and full capacity, its task count (1 task, 2 tasks), and the capacity status |
| 3 | Iteration goal | The team's goal for that iteration, in quotes. It is edited under the board, in Phoenix's goal per iteration |
| 4 | Dependency card | A dashed card headed Blocked by and the other team's name: this team waits on that team |
| 5 | Dependency state | Draft — not pushed, Waiting for an answer, Accepted or Declined; the needed-by iteration and where the other team has planned the work. Planned in turns red when that is later than needed |
| 6 | Story card | The key, the size, the assignee and the live status. Drag the card to another column to re-plan it |
| 7 | Card footer | waits on 1 other team — the story has a cross-team dependency. Risks linked to the story are counted here too |
| 8 | Add task | A new task straight onto the board, in that column. It is created in the project's tasks when the plan is committed |
Reading a story card
- The strip along the top has four segments that light up as the card is planned: assigned (green), sized (blue), in a feature (purple) and in an iteration (yellow). Grey segments are what is still missing. The colours match the underline of the Resource, Size, Feature and Iterations views (see Team board views).
- The key opens the task; the small panel icon next to it opens a quick view with details, subtasks and comments.
- The size is in the session's measure. In a story-point session the pencil opens a grid of 1, 2, 3, 5, 8, 13, 20, 40, 100 and ? (not known yet). The calculator icon next to it brings the story to the team's poker table, and a size agreed there shows in green — see Planning poker.
- The … menu sets the assignee and the estimate, and removes the card from the team's plan (with a confirmation).
- Hover the card to open its footer: the link icon adds a dependency, the warning icon raises a risk linked to the story. Each is greyed out, with a tooltip, when your role may not do it.
Adding tasks
Add task at the top of a column, or the + in a column header, adds a task by title into that column. The new card is marked New task until the plan is committed, when it is created in the project's tasks. You need the Add stories right on this team's board.
6. Plan by, Group by and the board's filters
The columns change with Plan by; the cards stay the same. Dragging a card into another column changes exactly the property the view is about: Iterations plans it into an iteration, Resource assigns it, Size estimates it, Feature moves it to another feature, Milestone links a whole feature to a programme milestone and Dependencies lists and proposes cross-team dependencies. Type, Priority and Status group the cards by the live task and take no drops. Group by cuts every column into lanes, Card fields adds up to three lines to each card, and Filters, Find a task… and the person picker narrow what is shown.
Each view that changes something needs its own right in the project's rule book — for example Assign people for Resource or Size stories for Size. When your role lacks it, the line above the board says Your role cannot change this view — pick another Plan by. and the cards stay where they are.
Every view, with its figure, the right it needs and when to use it, is on Team board views.
The ⤢ button at the right of the line above the board shows the plan full screen; Esc leaves it. See The team panel.
7. Cross-team dependencies, step by step
- On the story that waits, hover the card and press the link icon in its footer — or press Add a dependency in the team panel's Dependencies tab. The drawer, with its numbered figure, is shown on The team panel.
- In Add a dependency: the story that waits is already filled in when you started from a card. Pick the team under Waits for team, choose User story or Feature, and pick what you wait for. The other team's stories are grouped by the iteration they are planned in.
- The drawer says where that work is planned: Atlas planned this story in PI 2026.4 · Iteration 1, or Not planned yet. For a feature it names the iteration of its last planned story.
- Pick Needed by (or leave Any time) and, if it helps, write What is needed, and why. If the work is planned later than you need it, a red line warns that the other team would have to bring it forward.
- Press Add dependency. It stays with your team as Draft — not pushed.
- When you are ready, press Push on the draft (in the panel or on its card). The other team now sees it on its board as a Blocking card, and its lead or scrum master gets a bell.
- The other team's lead or scrum master — or the RTE — answers with ✓ Accept (your team will deliver it in time) or ✗ Decline (your team cannot commit to it).
| Field | Control | Required | Validation | Where the values come from |
|---|---|---|---|---|
| This team's story (waits) | Searchable picker | Yes | Fixed once saved | The stories on your team's board |
| Waits for team | One button per team | Yes | Not your own team | The session's other teams your role may open |
| Its | User story / Feature switch | Yes | — | — |
| The story or feature | Searchable picker | Yes | — | The other team's board, or the features given to that team |
| Needed by | Picker | No — Any time | — | The PI's iterations |
| What is needed, and why | Text area | No | Up to 500 characters | Typed |
Editing a pushed dependency's target or needed-by sends it back to the other team to answer again; the drawer warns Atlas will be asked to answer it again. Only the person who created a dependency, or the RTE, can remove it. Accepted dependencies become real task dependencies when the plan is committed; declined ones do not.
8. The team panel
The panel beside the board keeps the team's other planning work next to the stories. It starts collapsed as a strip of icons and remembers open or closed per browser. Its tabs:
| Tab | What the team does there |
|---|---|
| Adjust | From the moment management shares its review until the plan is committed: the management adjustments for this team, to answer and apply — and an Undo icon beside an answer, to take it back (see Management review) |
| Risks | Raise team risks, link them to stories, and place them at ART level from Team breakout #2 |
| Objectives | Write committed and uncommitted (stretch) objectives; business owners score their planned business value on Day 2 |
| Dependencies | What this team waits for (drafts until pushed) and what other teams wait for from it, with accept and decline |
| SoS | The team's answers to the Scrum of Scrums checkpoints, while the teams plan and through the reviews |
Under the board sits the team's goal per iteration, and above it the banners that tell the team its plan was sent back or must be reworked. All of these, with their figures, are on The team panel.
9. Worked example: Phoenix plans Day 1
Arjun Rao, Phoenix's lead, opens Team boards when Maya Fernandes starts Team breakouts. Phoenix is first in the strip, marked You, with 8 open stories.
- Capacity. The session counts in story points. Tom Becker, the scrum master, presses Set capacity and enters 10, 24 and 20 SP for Iterations 1–3 with the focus factor at 0.80. The targets become 8, 19.2 and 16 SP.
- Planning. The team drags One-tap checkout with saved cards (8 SP) and Address autocomplete (3 SP) into Iteration 1. The column turns red: 11 SP / 8 SP · 10 SP full, Over capacity, and the header shows 1 iteration to check. Iterations 2 and 3, at 15 and 10 SP, read Within focus.
- Goals. Under the board they write the iteration goals: Saved-card checkout end to end, Wallet buttons and offline browse, Orders queue while offline.
- Dependencies. One-tap checkout needs Atlas's Device fingerprint signals. Arjun hovers the card, presses the link icon, picks Atlas, the story, Needed by Iteration 2, and pushes it. Checkout analytics events needs Orion's Distributed tracing for checkout by Iteration 3. Both show as Blocked by cards, Waiting for an answer; Atlas's and Orion's leads accept them later in the day.
- Objectives and risks. In the panel they add two committed objectives — Shoppers pay with a saved card in one tap and Wallet payments on iOS and Android — and one stretch objective, Browse the catalogue offline. PBV stays empty: business owners score it on Day 2. They raise the team risk Apple Pay merchant approval may take 3 weeks, impact high.
- SoS. Tom marks the first checkpoints done and Have you begun resolving dependencies with other teams? in progress.
At the draft plan review the over-capacity iteration is the first thing management sees; on Day 2 Phoenix applies the decision to postpone Offline mode.
10. The admin contract
| Must be in place | Where | What happens without it |
|---|---|---|
| The teams, with members, roles and share of time | Organization Settings → Planning Teams (Planning teams) | No team strip, no capacity from people, nobody marked You |
| The teams chosen for the session, and the session published | The session's setup (Create a session) | No teams in this session, or The boards are created when the session is published |
| Features given to teams | Features & teams (Features and teams) | The team's board has no stories |
| The rule book | Project settings → PI Planning → Roles & permissions (Roles and permissions) | Without changes, the default applies: team roles plan their own board and may raise risks and dependencies on others; the RTE plans every board |
| The estimation unit, focus factor and planning words | Project settings → Planning (Project planning settings) | Capacity is counted in hours with a focus factor of 0.80; columns say Sprint and Category |
| Milestones | The project's Roadmap | Plan by Milestone has only the no milestone column |
11. Downstream effects
- The draft plan review shows each team's load, stories, objectives, risks and dependencies from this board.
- The ART Planning Board places each team's features and significant dependencies from it.
- The management review reads the load per team and iteration, and the features still in the backlog.
- At merge & commit the moves, sizes, assignees, new tasks, goals and accepted dependencies are written to the project's tasks once.
12. Don't confuse this with…
- The ART Planning Board — every team's features on one board, not one team's stories. See ART Planning Board.
- Planning — the single-planner page with scenarios. A team board looks like it but holds one team's work and one team's people.
- The Objectives tab and the Risks tab — session-wide lists. The panel shows only this team's objectives, and its risks at both levels. See Objectives.
- Scrum of Scrums — the RTE's overview of every team's checkpoints; the SoS panel tab is one team's answers.
13. Troubleshooting
| What you see | Why | What to do |
|---|---|---|
| The team boards open when Team breakouts starts | The session is still in the briefing | Wait for the facilitator to start Team breakouts |
| A Business Owner reads You take part as a Business Owner, not in a team and cannot move cards | They are in no team; their ART role sets business value and votes, but does not plan a board | Expected — the teams plan their boards |
| You are following this session as an observer | You are in no team and hold no ART role | Ask the RTE to add you to a team or name your ART role on the session |
| Read-only — this is another team's board | You are on another team's board | Switch to your own team in the strip |
| You can plan on this board. on another team's board, but cards will not move | Your role may raise risks or dependencies there, but not plan | Use the footer icons only; the line Your role cannot change this view confirms it |
| Set capacity is missing | Your role lacks the Team capacity right, or the session is in review | Ask the scrum master or the RTE, or wait for the adjustment round |
| Save capacity is greyed out | The focus factor is outside 0.10–1.00 or the split is over 100 % | Correct the red field |
| PBV slider is greyed out | Business value is set from Team breakout #2 by business owners or the RTE | Agree the value with them on Day 2 |
| The ↑ on a risk is greyed out | Team risks move to ART level from Team breakout #2 | Raise it again on Day 2, or ask the RTE |
| Your dependency stays a draft | It was never pushed | Press Push on it |
| You cannot accept a dependency | Only the other team's lead or scrum master, or the RTE, answers | Ask them; they see it on their board |
| A story's dependency card shows Planned in in red | The other team planned the work after your needed-by iteration | Agree a new date with them, or move your story |