Draft plan review

What this page is — a guide to the Draft plan review tab of a PI Planning session: each team's Day 1 plan summarised on one screen — load against capacity, stories, objectives, risks and dependencies — with a Present mode that turns it into slides the whole session follows.

What it is for — the hour after Team breakouts, when every team presents its draft to management and the other teams, and everyone sees where the plan is realistic and where it needs help.

The problem it solves — teams usually present a draft plan by screen-sharing their board, scrolling, and reading numbers aloud. Every team shows something different, nobody sees the capacity picture in the same way, and management leaves without the facts it needs for the management review an hour later.

Route: Orbit Ops → PI Planning → open a session → Draft plan review, under Team boards (/org/tasks/pi-planning?project=…&session=…&tab=draft_review) · Permission: Open PI Planning sessions read-only: brief, team boards, program board, risks, discussion, objectives and review.


1. A read-only summary, one team at a time​

The tab draws each team's numbers instead of listing them. Nothing on it can be edited: it reads the team's board, capacity plan, objectives, risks and dependencies as they are when you open it. If a team corrects its board during the review, the summary follows.

Draft plan reviewTeam boardFinal plan review (Day 2)
WhenEnd of Day 1, after Team breakoutsDuring the breakoutsEnd of Day 2
ShowsThe draft plan, summarisedEvery story and controlThe final plan against the Day 1 plan
Can change the planNoYesNo; management accepts a plan or sends it back
AudienceManagement and every teamThe teamManagement and every team

Who can open it follows the Draft plan review row of the project's Roles & permissions rule book. A role with no choice recorded for that row yet opens the tab if it opens Team boards or Confidence vote; saving the rule book records every row as shown. Without the row there is no tab, and a shared presentation of it reaches you only as a strip (section 6).


2. Why you would use it​

  • The same picture for every team. Each team is shown in the SAFe draft-plan-review order — capacity and load, draft objectives, risks and impediments — so the room compares like with like.
  • Problems stand out. An over-capacity iteration is red, a stretch objective is grey, a team blocked by others has an amber count. Management does not have to dig.
  • A ready-made presentation. Present shows one part per slide in large type. When management presents, everyone in the session follows the same team and slide on their own screen.
  • A record for Day 2. Closing this agenda item saves every team's Day 1 plan, which the final plan review compares against.

3. Where it fits in the event​

Agenda momentWhat happens to the tab
Before Team breakouts closesThe sidebar entry carries a lock; opening it reads The draft plan review opens after Team breakouts
The facilitator closes Team breakoutsThe tab opens; the session moves on to review when the Draft plan review item starts
Draft plan review runsThe entry is marked live; each team presents in turn
The facilitator closes Draft plan reviewOrbit saves each team's Day 1 plan, and the Management review opens for management

During the review the boards are read-only for the teams; risks, objectives and dependencies stay open.


4. The screen​

Figure 1 — Phoenix's draft plan: the summary tiles and the first part.
#ElementWhat it does
1Team switcherOne team at a time. Pick the team that is presenting; your own team is first
2PresentFull-screen slides; shared with the whole session when management presents (section 6)
3Plan headingThe team, how many people are in it, the PI and its number of iterations, and the features the team plans
4LoadPlanned load as a share of the team's full capacity across the PI, with 1 iteration over or N iterations over — the project's word for a sprint. Red when an iteration is over capacity, amber when the load is above the focus share
5Stories plannedStories in the iterations, with how many are still in the backlog and how many features they belong to
6Committed objectivesThe number of committed objectives, their planned business value so far, and the number of stretch objectives
7Open risksRisks of this team still in the Open ROAM state, and how many it raised in all
8Blocked byCross-team dependencies this team waits on (not counting declined ones)
9Section 1Capacity and load per iteration, with the focus target
10Merge & commitThe RTE's button in the session bar for merging the teams' plans after the event — see Post-PI Planning. It has nothing to do with the draft review itself

Section 1 — Capacity and load for each iteration​

The team's ability to handle work against the load planned in every iteration: a realistic plan, and where it may need more people or less work.

  • A bar per iteration shows the load in the session's measure, stacked by task type. The solid mark is the full capacity; the dashed mark is the focus target (the line above the chart names the percentage, for example 80 %). Hover a bar for the load, capacity and focus target in numbers.
  • Below the chart, one card per iteration: its stories and load against capacity, a bar (red when over), an Over capacity warning when it applies, and the team's goal for that iteration — or No goal written for this iteration.
Figure 2 — Sections 2 and 3: the draft PI objectives, and the team's risks and dependencies.
#ElementWhat it does
1Section 2The draft objectives, committed and stretch, each with a bar for its planned business value (1–10)
2Stretch — uncommittedThe team's stretch objectives, listed under the committed ones in grey
3Section 3Risks and impediments: a ring of the team's risks by ROAM state, and the open ones listed with their state, level, impact and owner
4Blocked by other teamsThe dependencies this team waits on, with the other team, the story and its status
5Other teams waitingThe dependencies other teams wait on from this team

Section 2 — Draft PI objectives​

The objectives the team aims to achieve this PI, for early feedback and alignment before they are finalised. The line under the title sums them up — committed count, planned business value, stretch count. On Day 1 the business value is normally 0: business owners score it in Team breakout #2. With no objectives the section reads No objectives drafted yet — the team writes them in its board's side panel.

Section 3 — ART PI risks and impediments​

A ring chart counts the team's risks by ROAM state (Open, Owned, Mitigated, Accepted, Resolved). The open risks are listed — up to five on screen, eight when presenting, then +N more on the Risks tab. Beside them, Blocked by other teams and the other teams that wait for this one, each reading The team waits on nobody or No other team waits on this one when empty.


5. Step by step: running the review​

  1. When the breakouts are done, the RTE presses Close: Team breakouts and starts Draft plan review on the agenda.
  2. The RTE opens Draft plan review and picks the first team in the switcher.
  3. The RTE presses Present. The first slide shows the plan heading, the five tiles and a line explaining the review. Everyone in the session is taken to this tab and follows the same team and slide.
  4. Use → (or Page Down) to go to Capacity and load, Draft PI objectives and ART PI risks and impediments; ← goes back. The counter at the top shows, for example, 1 / 4. The room's screens turn with yours.
  5. Pick the next team in the switcher at the top of the slides; the slides start again at the first part, for everyone.
  6. Press End presenting (or Esc) when every team has presented. The presentation ends for everyone.
  7. The RTE presses Close: Draft plan review. The Day 1 plan of every team is saved and the management review opens.

Field reference: the controls​

ControlTypeNotes
Team switcherButtonsTeams your roles may open
Present / End presentingButtonAlso Esc to leave. The presenter's End presenting or Esc ends a shared presentation for everyone; a follower does not see this button
Previous / NextButtons, ← and → keys, Page Up and Page DownFour slides per team. Shown to the presenter only
Following badgeBadge, Following Maya FernandesShown to a participant who follows a shared presentation, in place of the presenting controls
Leave presentationLink in the badgeLeaves the presentation and returns you to your own screen. Tooltip: Leave the presentation — you can rejoin from the banner
Bars and the ringChartsHover for numbers; nothing is clickable

There are no fields to fill on this tab.


6. Present mode​

Figure 3 — Presenting: the first of four slides for Phoenix.

Present mode hides the session's menus and shows one part at a time in larger type. The first slide is the overview; slides 2 to 4 are the three sections. The team switcher stays at the top, so the next team can take over without leaving the slides.

Who sees the presentation​

Who presses PresentWhat happens
Management — the RTE, the Product Manager, the System Architect, a Business Owner, or a PI Planning managerThe presentation is shared: everyone in the session is taken to Draft plan review and follows the presenter's team and slide
Anyone elsePresent mode opens on their own screen only

As a participant following it:

  • You see the presenter's team and slide and cannot turn the slides yourself; the presenting controls are replaced by the badge Following Maya Fernandes with Leave presentation.
  • Leave presentation takes you back to your own screen. A strip at the bottom then reads Maya Fernandes is presenting. with Rejoin.
  • If your role does not open Draft plan review, you stay where you are and the strip reads Maya Fernandes is presenting a screen your role does not open.
Figure 4 — A participant follows the draft plan review: same team, same slide as the presenter.
#ElementWhat it does
1Following Maya Fernandes · Leave presentationThe presenter's name, and the way out; the arrows and End presenting are the presenter's only

Only one shared presentation runs at a time. Another manager who presses Present meanwhile sees Could not share the presentation — Someone else is presenting — they end it first, or the RTE takes over. It shows on your screen only.; the RTE can take over. The presenter's notices, the strip and how long a presentation lasts are described on Agenda.


7. The Day 1 baseline​

When the facilitator closes the Draft plan review agenda item, Orbit saves each team's plan as it stands: per iteration the capacity, focus target and load, and the team's objectives with whether they are committed and their business value. This is the Day 1 plan.

  • It is saved once per team. Closing the item again does not overwrite it.
  • The Final plan review shows every change against it: Changes are shown against the Day 1 plan saved ….
  • If the session had no Draft plan review item, or it was never closed, the final plan review says No Day 1 plan was saved. The RTE can then press Save the plans as they are now there — or Save the plans as they are now instead to replace an earlier one.
Close the item, do not just move on

Starting the next agenda item without closing the Draft plan review leaves the Day 1 plan unsaved until the item is closed. Close it before management starts its review.


8. Worked example: Phoenix presents​

At 16:00 Maya Fernandes closes Team breakouts, starts Draft plan review and presses Present; every screen in the session follows hers. Priya Sharma speaks for Phoenix while Maya turns the slides.

  1. Overview. Load 67 % — 36 SP of 54 SP, 1 iteration over. Seven stories planned, one still in the backlog, across Mobile Checkout 2.0 and Offline mode. Two committed objectives, business value 0, one stretch. One open risk. Blocked by 2.
  2. Capacity and load. Iteration 1's bar rises above its solid mark: 2 stories · 11 SP of 10 SP, Over capacity. Iterations 2 and 3 sit under their dashed marks. Each card shows the goal, from Saved-card checkout end to end to Orders queue while offline.
  3. Objectives. Shoppers pay with a saved card in one tap and Wallet payments on iOS and Android are committed; Browse the catalogue offline is stretch. All bars are empty — business owners score them tomorrow.
  4. Risks and impediments. One open risk, Apple Pay merchant approval may take 3 weeks, high impact, no owner. Blocked by Atlas (device fingerprint signals) and Orion (distributed tracing), both waiting for an answer.

Atlas and Orion present next. At 17:00 Maya closes the item; the three Day 1 plans are saved, and in the management review the over-capacity iteration and the offline-mode scope become the first questions.


9. The admin contract​

Must be in placeWhereWhat happens without it
An agenda with Team breakouts and Draft plan review itemsThe session's agenda (Agenda)The tab opens only when the session moves to review, and no Day 1 plan is saved automatically
Capacity set by each teamSet capacity on the team board (Team boards)The Load tile reads no capacity set and the chart has no marks
Iteration goals and objectives writtenThe team board and its panelNo goal written for this iteration, No objectives drafted yet
The Draft plan review row for the roles that attendProject settings → PI Planning → Roles & permissions (Roles and permissions)No tab; a shared presentation shows only as a strip. A role without access to the teams reads No team to review — your role does not open the teams' plans

10. Downstream effects​

  • Closing the item saves the Day 1 plan used by the final plan review.
  • Closing it also opens the management review for management.
  • Nothing on the teams' boards changes.

11. Don't confuse this with…​

  • The management review — management's own working session right after this one, with questions and decisions. See Management review.
  • The final plan review — Day 2's review, where management accepts each plan or sends it back. See Final plan review.
  • Merge & commit — writes the plan to the tasks after the event. See Post-PI Planning.

12. Troubleshooting​

What you seeWhyWhat to do
A lock on the sidebar entry and The draft plan review opens after Team breakoutsThe Team breakouts item has not been closedThe facilitator closes it
No team to reviewYour roles open the tab but no team's boardAsk the RTE to adjust Roles & permissions
Load reads no capacity setThe team never set its capacityThe team sets it in an adjustment round, or reads load in the chart
Committed objectives show business value 0Business value is scored on Day 2Expected on Day 1
A team's risk is missing from the Risks tab but shows hereTeam-level risks stay on the teamExpected; section 3 shows both levels
Present mode shows the wrong teamThe switcher keeps the last team pickedPick the team at the top of the slides
Could not share the presentation — Someone else is presenting — they end it first, or the RTE takes over.Another manager is already presentingAsk them to end it, or the RTE takes over; meanwhile the slides show on your screen only
The slides do not turn and there are no arrowsYou are following someone else's presentationWait for the presenter, or Leave presentation
Your Present is not followed by the roomOnly management shares a presentationAsk the RTE to present
… is presenting a screen your role does not open.Your role lacks the Draft plan review rowAsk the RTE to add the row in Roles & permissions
The final plan review says no Day 1 plan was savedDraft plan review was never closedThe RTE saves the plans from the final plan review